by chuck79 » Sat Jun 13, 2015 11:04 pm
Finally got something off my to do list. Got the front LCA's of the old junk Monza disassembled so I can get them blasted and look at putting the S-10 sleeves and ball joints in. These one have the sway bar mounts, The ones on my bird don't. Have to clean up the bolts and stuff still.
You do not have the required permissions to view the files attached to this post.