I have the 2X4 box tubing frame rails installed and mig welded inplace. I will be taking out the engine to finish the new mounts and tie the front end into the frame rails. The headers have been coming along nicely. I ordered some J pipes from the speedshop and have been tacking things together. I have decided I will use slip joints on a few if the header tubes to make servicing things a bit easier. I will try and upload pictures soon.
Milan
IMG_20130807_223809_140 (135x240).jpg
IMG_20130807_223809_140 (135x240).jpg
IMG_20130807_223905_799 (135x240).jpg
IMG_20130807_223921_665 (135x240).jpg
IMG_20131009_211651_265 (135x240).jpg
IMG_20131009_211651_265 (135x240).jpg
IMG_20131009_211651_265 (135x240).jpg
You do not have the required permissions to view the files attached to this post.