by NVEGAR8D » Mon Aug 07, 2017 10:26 pm
Well we've been in the new house a year and slowly getting it fixed up. I've finally gotten some time to start setting up the shop/garage for the Vega. Last fall i had heat installed, now i'm drywalling and painting, soon to start wiring. I will need to make a steel trap door to the basement to cover the hole on the right. Here are some pics of progress so far.Hopefully soon i can start putting cabinets up from the floor to the walls and slowly gain floor space to move around.
You do not have the required permissions to view the files attached to this post.