by vegastre » Thu Jul 31, 2014 8:37 pm
June/July Update
In Texas in the summer I can only work on the car a few hours in the morning a few days a week. In fact some mornings start off close to 90F degrees. So, I can't lie =) work has slowed but still progress is being made. The big hump is I have worked out all the radiator hoses angles, curves, splices. Made a dozen trips to the parts store. Very, very time consuming not to mentioned I have rewired a portion of the harness to give it a better flow. Luckily the 3800 although designed for front wheel drive cars they did come in Camaros and Firebirds so this helped a bit on hose location. Currently I'm measuring and fitting the power steering hoses which is another whole deal, very time consuming. The design is the hard part, making the part and bolting it on is the easy part. I don't even want to mention how I get sidetracked. I recently built a complete console for the SJ interior but believe it or not I do see light at the end of the tunnel, I think.
You do not have the required permissions to view the files attached to this post.
Phil Kennedy~
72 Chevrolet Vega GT Hatchback
75 Pontiac Astre SJ Safari Wagon